Location: Gresik, East java
Year of Completion: 2009

Project Background:

With the new expansion of factory area, the machine base are required to be extended to cover the entire floor.

Customer Requirements:
Grouts to machine baseplates with
- compressive strengths upto 60MPA
- good performance for vibrating equipment

BASF's Solution:
BASF provides high-strength, precision non-shrink grout that has early laod transfer properties which allows rapid commissioning of equipment and minimised downtime.

Products Used:
Masterflow 830
and Masterflow 870