*Cement Plant - PT. Semen Baturaja
|
Repair works using Masterflow 322M, Emaco Nanocrete R4, Concresive 1333, Concresive 1438, Concresive 2525, MBrace Strengthening system
...
|
|
| |
|
|
*Cipularang II Toll Road
|
Pozzolith 101 RI, Rheobuild 1100, Glenium 317
...
|
|
| |
|
|
*Mayora Indah - Biscuit Plant II, Jatake
|
Flooring system for plant, Ucrete MF, Mastertop 1210
...
|
|
| |
|
|
*Pelindo 4 - Jetty Repair
|
Jetty repair using Masterflow 322, Emaco Z40, Masterseal 300H and Concresive 1438
...
|
|
| |
|
|
*Petrochemical, Gresik
|
Grouting of baseplate using Masterflow 830 and Masterflow 870
...
|
|
| |
|
|
*Sasa Factory
|
Sealant and waterproofing for new Production factory - Masterflex 700 and Sonoshield 300H
...
|
|
| |
|
|
*Sepinggan Airport
|
Waterproofing for Seppinggan Airport using Masterflex 700
...
|
|
| |
|
|
*SMP 1 (Junior High School)
|
MBrace Strengthening System: Strengthening beams and decking plat concrete
...
|
|
| |
|
|
Balambano Hydro Power Plant
|
Pozzolith 1000Ri, Rheobuild 1000...
|
|
| |
|
|
Bandara Cengkareng
|
Repair Runway - Bandara Cengkareng, using Emaco T288
...
|
|
| |
|
|
Blok M Square
|
Beam Strengthening using MBrace Carbon Fibre Laminate and Concressive 1438 due to change of structure use....
|
|
| |
|
|
Braga Citywalk
|
Braga Citywalk Strengthening using MBrace CF130
...
|
|
| |
|
|
Ceres Indah
|
Flooring: UCRETE MF Pastel Green & Green...
|
|
| |
|