Search
Home >> References >> Thailand >> *Cadbury Adams

*Cadbury Adams 

Location: Bangkok

Year of Completion: 2009

Project Overview: The existing structures of electronic factory were changed to become the production and warehouse of candy and gum products. The existing floors have to be refurbished.

Customer's Requirements: Flooring systems for production and corridor area that are:
- PU concrete flooring for both medium and heavy duty
- Epoxy flooring
- Chemical resistance
- Hygiene and easy to clean
- Durable

BASF's solution:
- Ucrete MF
- Ucrete UD200
- Ucrete WR
- Mastertop 1110

 

 

DisclaimerCreditsData ProtectionCopyright 2008 BASF SE
BASFCC.Moss.Core.wsp 1.0.0.1 - S:37 T:17/05/2012 22:43:27