*Dung Quat Refinery

Location: Quang Ngai - Vietnam
Duration: 2005 - 2009
Industry Segment: Heavy industry
Project Background:
Dung Quat oil refinery, the Dung Quat Economic Zone, the first oil refinery built in Vietnam's territory Binh Thuan and Binh Tri, Binh Son, Quang Ngai. This is one of the major economic projects, key countries of Vietnam in the early stages the 21st century.
Plants constitute an area of about 338 hectares and 471 hectares of ground and sea with a capacity of 6.5 million tons of crude oil per year equivalent to 148,000 barrels a day expected to meet about 30% of gasoline demand in Vietnam .
Project Challenges and Customer Requirements:
This mega project needs concrete for sea-water environment, non-shrink grout and rock pile grouting, and roof waterproofing.
BASF Solution:
BASF products were used in this megaproject: Glenium SP8S, Rheomac SF100, Masterpren 1000, Masterflow 648CP, Masterflow 816.
Customer Needs:
Concrete 40 Mpa
Requirements / technical specifications:
Slump after 2.5 hr : 16 ± 2 cm
Strength @ 7 days : 100%
Silicafume : 10% at least |
Products used:
Glenium SP8S: 250,000 liter
Rheomac SF100: 800 MT
|
Customer Needs:
Roof waterproofing
Requirements / technical specifications:
Membrane type |
Products used:
Masterpren 1000: 20,000 m2
|
Customer Needs:
Polysulphide/ polyurethane sealant
|
Products used:
Masterflex 700: 3,000 sets
Sonolastic NP1: 1,000 pcs
|
|
Customer Needs:
Non-shrink grout, strength 65Mpa
Epoxy grout strength 100 Mpa @ 1day
|
Products used:
Construction grout: 800 MT
Masterflow 648CP: 100 sets |
Customer Needs:
Rock pile grouting |
Products used:
Masterflow 816 concentrate: 300 MT
|
Customer Needs:
Epoxy painting |
Products used:
Mastertop 1110 (oyster white): 200 sets
|
|
Other products:
Barra 82: 80 MT
Masterseal SP120: 60 cans