Ong Lon Bridge

Location: Ho Chi Minh city
Time: 2004
Description:
Concrete-filled steel tube (CFST) arch. The stress-deformation state of the arch has been treated by outside prestressing cables between the arch ends;
This is the first project in Vietnam, for which the such structure successfully has been applied. Span length: 99 m
Concrete volume: 180m³
Customer Needs: High slump retention / strength / non-shrinkage
Our Solution: Glenium SP8S
Qty of BASF’s used product: 1,080 lit
|
|
|
|
|