Search
Home >> References >> Vietnam >> Ong Lon Bridge

Ong Lon Bridge 


Location: Ho Chi Minh city

Time: 2004

Description:
Concrete-filled steel tube (CFST) arch. The stress-deformation state of the arch has been treated by outside prestressing cables between the arch ends; 

This is the first project in Vietnam, for which the such structure successfully has been applied. Span length: 99 m

Concrete volume: 180m³

Customer Needs
: High slump retention / strength / non-shrinkage

Our Solution: Glenium SP8S

Qty of BASF’s used product: 1,080 lit

 

DisclaimerCreditsData ProtectionCopyright 2008 BASF SE
BASFCC.Moss.Core.wsp 1.0.0.1 - S:37 T:17/05/2012 22:54:11